Wired Pipeline

case study 11 · cold email copy

Three cold sequences for an industrial safety product

cold email copysequencesconstructionindustrialInstantly / Smartlead

A sample built for a real kind of job: a company selling cord clamps (they keep temporary power cords off the floor on jobsites) to US contractors with 50 to 500+ employees. Three buyers, three sequences, three emails each. The product is unnamed and its details are placeholders. The writing, the reasoning and the scores are real.

How these are built

  • One sequence per buyer. A safety manager, a site super and a GC owner care about different things, so they don't get the same email
  • Short. 39 to 83 words. Contractors read email on a phone between site visits
  • One easy question per email, and an easy way out ("not the right person? just say who is")
  • The offer is a sample box on a real job, not a call. Crews trust what they can put their hands on
  • No links, no images, plain text. Construction companies run strict spam filters, and the first email has to look like a person wrote it
  • Day 1, day 4, day 9, stop on any reply, and the last email closes the loop politely

What we left out on purpose

  • "OSHA compliant." A product can't make a site compliant, and claiming it in writing is a legal risk for the client. We talk about the hazard, not the regulation
  • Injury statistics. Easy to get wrong, and they read like a scare pitch
  • Discounts and urgency. Nobody on a jobsite buys because of a "limited time offer"
  • Calendar links. A super won't book a 30 minute call with a stranger. They will take a free box of clamps

Before and after, scored by our copy checker

This is the kind of first draft we see all the time, run through our free cold email copy checker:

subject: OSHA COMPLIANCE GUARANTEED - Act Now!!!

Dear Safety Manager,

I wanted to reach out because our 100% OSHA compliant cord clamps are the best price in the market and guaranteed to eliminate trip hazards forever! Click here to see the catalog https://example.com/catalog and watch our video https://example.com/video and book a demo at https://example.com/demo

<img src="https://example.com/banner.png">

This is a limited time offer for {{CompanyName}} only. Let me know when you are free for a 30 minute call to discuss your safety program, your current vendors, your upcoming projects and how we can partner together going forward!!

Best regards
draft     Score: 20/100 · rewrite before sending
          ✗ Trigger phrases: act now, limited time, guarantee, click here, best price, 100%
          ✗ 4 links. Use one at most in the first email, ideally none
          ✗ An image. Images in cold email look like marketing and hurt placement
          ✗ ALL CAPS in the subject
          ✗ 6 exclamation marks
          ! No question. End with one easy question so replying is simple

A1-A3, B1-B3, C1-C3    Score: 100/100 · ready to send (all 9)

The checker has limits, and it's worth being honest about them. It couldn't tell that "100% OSHA compliant" is a claim the client shouldn't make. That one took a person. It also flagged "OSHA" as shouting on the first run, so we taught it the safety acronyms (OSHA, EHS, PPE, GFCI and a few more) before scoring the rest.

Sequence A · safety managers at commercial electrical contractors

They own the walkthrough findings. The angle is the hazard they write up every week, and a sample they can test on one job.

email 1 · day 1 · subject: cords on {{companyName}} sites

Hi {{firstName|there}},

Extension cords across walkways are one of the most common trip hazards on electrical jobs, and tape doesn't hold them past lunch.

We make a clamp that holds temporary power cords up on studs, rails and scaffold, off the floor. It goes on without tools, and crews can move it in seconds when the layout changes.

Would a few samples for one of your active jobs be worth a look?

If cord management isn't yours, who handles it at {{companyName}}?

{{sendingAccountFirstName}}

email 2 · day 4 · subject: (same thread, no new subject)

Hi {{firstName|there}},

Quick follow-up. The clamps are reusable job to job, so there's no tape or zip ties to buy and cut off every week.

Happy to send a pair before your next site walkthrough, so you can see if the crews actually use them. Worth sending?

{{sendingAccountFirstName}}

email 3 · day 9 · subject: (same thread, no new subject)

Hi {{firstName|there}},

Last note from me. If loose cords aren't a problem on your sites right now, no worries at all.

If they are, just reply with the job address and we'll ship a sample box there. Should I send one?

{{sendingAccountFirstName}}

Sequence B · project managers and supers, industrial and heavy civil

They care about the schedule and the cost of crushed cords. The angle is speed: on and off in seconds when the run moves.

email 1 · day 1 · subject: temporary power on {{companyName}} jobs

Hi {{firstName|there}},

On big sites the temporary power runs change every week, and cords end up on the ground where equipment and crews cross them.

Our clamps hang cords off guardrail, scaffold or fencing in a few seconds, and come off just as fast when the run moves. Fewer crushed cords and fewer trip write-ups.

Could your super try a box on one job this month?

Not the right person? Just say who is.

{{sendingAccountFirstName}}

email 2 · day 4 · subject: (same thread, no new subject)

Hi {{firstName|there}},

One more angle. Cords that sit in traffic get crushed and replaced, and a damaged cord on a wet site is a bigger problem than the replacement cost.

Off the ground, they last longer. Want pricing for a 50 pack so you can compare it with what you spend on cords now?

{{sendingAccountFirstName}}

email 3 · day 9 · subject: (same thread, no new subject)

Hi {{firstName|there}},

I'll leave it here. If cord damage and trip hazards are handled on your jobs, that's great.

If a sample box would help on the next one, reply with where to send it. Is that worth doing?

{{sendingAccountFirstName}}

Sequence C · owners, ops and purchasing at general contractors

They answer for the whole site, including every sub. The angle is one standard for everyone, not a product pitch.

email 1 · day 1 · subject: a small fix for site walkthroughs

Hi {{firstName|there}},

When an owner, an insurer or an inspector walks a site, loose cords are an easy thing to get written up for.

We make cord clamps your subs can use on day one: no tools, reusable, and priced to keep a handful in every gang box.

Would it help if we sent your safety lead a sample kit?

If this belongs with someone else at {{companyName}}, who should I ask?

{{sendingAccountFirstName}}

email 2 · day 4 · subject: (same thread, no new subject)

Hi {{firstName|there}},

A thought on the GC side. When every sub brings their own fix for cords, the site ends up with tape, zip ties and nothing at all, depending on the crew.

Some GCs stock one clamp for the whole site so the standard is the same everywhere. Would that be useful on your jobs?

{{sendingAccountFirstName}}

email 3 · day 9 · subject: (same thread, no new subject)

Hi {{firstName|there}},

Last one from me. If this isn't a priority right now, no problem.

If you'd like a sample kit for your safety lead, just reply with a name and I'll set it up. Want me to?

{{sendingAccountFirstName}}
✓ 3 buyers, 3 sequences, 9 emails, all 100/100 on the checker
✓ 39 to 83 words each, no links or images, one question each
✓ Ready to paste into Instantly or Smartlead, merge fields with fallbacks
# product details are placeholders. nothing here has been sent.

Need sequences that sound like a person?

Run your own draft through the checker first. Then talk to us about the rest.